Practical software estimation : (Record no. 415)

MARC details
000 -LEADER
fixed length control field 01682nam a22002177a 4500
003 - CONTROL NUMBER IDENTIFIER
control field LSCPL
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20200224122804.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 130330t2007 ii.ill.g |||| 001 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 8131711463 (pbk)
040 ## - CATALOGING SOURCE
Transcribing agency NCL
Modifying agency LIN2019
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 005.3
Item number PAR-P 2007 631
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Parthasarathy, M. A.
9 (RLIN) 852
245 1# - TITLE STATEMENT
Title Practical software estimation :
Remainder of title function point methods for insourced and outsourced projects /
Statement of responsibility, etc. by M.A. Parthasarathy
260 ## - PUBLICATION, DISTRIBUTION, ETC. (IMPRINT)
Place of publication, distribution, etc. New Delhi :
Name of publisher, distributor, etc. Pearson Education Private Limited,
Date of publication, distribution, etc. 2007c.
300 ## - PHYSICAL DESCRIPTION
Extent xxxiv, 388 p. :
Other physical details ill. ;
Dimensions 24 cm.
500 ## - GENERAL NOTE
General note Index included
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note Chapter 1: Introduction -----------------<br/>Chapter 2: Role of estimation in software projects -------------------<br/>Chapter 3: A study of function point analysis ------------------<br/>Chapter 4: functions --------------------<br/>Chapter 5: Transactional functions -----------------<br/>Chapter 6: General system characteristics ----------------------<br/>Chapter 7: Size, effort, and scheduling of projects --------------------<br/>Chapter 8: Estimation flavors -------------------<br/>Chapter 9: A sense of where you are --------------------<br/>Chapter 10: Tips, tricks, and traps --------------------<br/>Chapter 11: Insourcing versus outsourcing -------------------<br/>Chapter 12: Key factors in software contracts --------------------<br/>Chapter 13: Project estimation and costing ----------------------<br/>Chapter 14: Other estimation methods --------------------<br/>Chapter 15: Estimation tools --------------------<br/>Chapter 16: Estimation case study ---------------------.
520 ## - SUMMARY, ETC.
Summary, etc. A primer for a complicated set of topics.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name as entry element Computer software
General subdivision Development
9 (RLIN) 411
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme
Koha item type Books
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Shelving location Date acquired Source of acquisition Cost, normal purchase price Inventory number Total Checkouts Full call number Barcode Date last seen Date checked out Price effective from Koha item type
          Namal Library Namal Library Computer Science 03/30/2013 Allied Book Company 374.25 Bill No. 1415 1 005.3 PAR-P 2007 631 631 09/20/2016 09/07/2016 07/18/2013 Books